Think Railways

FYR Macedonia Railway Data

    AŽD Praha to deliver signaling equipment  to Macedonia

AŽD Praha to deliver signaling equipment  to Macedonia

AŽD Praha has signed a EUR 3.1 million contract for delivery and installation of signaling equipment for Macedonia’s Kumanovo- Beljakovce railway corridor. In the tender, the call for which was issued by Macedonian railway infrastructure manager in 2013, the Czech company participated as one of contractors with German H.F. Wiebe GmbH &

0 comment Read Full Article

Rehabilitation of Macedonian Railways rolling stock maintenance depot

Macedonian Railways Transport JSC Skopje (MRTJSC) intends to use part of the proceeds of a loan from the European Bank for Reconstruction and Development (EBRD) towards the cost of the Macedonian Railways Rehabilitation Project which forms part of the overall Macedonian Railways Fleet Renewal Project (the Project). MRTJSC now invites sealed

0 comment Read Full Article
    FYR Macedonia: Reconstruction of Bitola ­- Kremenica railway line to begin in Q1 2015

FYR Macedonia: Reconstruction of Bitola ­- Kremenica railway line to begin in Q1 2015

Macedonian Transportation and Infrastructure Minister Mile Janakieski announced that the  reconstruction of the non-electrified single-track railway section Bitola ­Kremenica railway line, part of Xd of corridor X, will begin in Q1 2015. “We have signed a contract with a Bulgarian based consortium and we expect works to begin in the first quarter of 2015.

0 comment Read Full Article
    FYR Macedonia: EUR 145 million EBRD loan for second phase of the railway line to Bulgaria

FYR Macedonia: EUR 145 million EBRD loan for second phase of the railway line to Bulgaria

The European Bank for Reconstruction and Development (EBRD) has approved a EUR 145 million to FYR Macedonia for the construction of the second phase of the railway to Bulgaria,  the Beljakovce – Kriva Palanka railway section (33.9 km), part of pan-European Corridor VIII. The loan was obtained under exceptionally favorable conditions, according

0 comment Read Full Article
    FYR Macedonia launches consultancy service tender for railway line project to the Bulgarian border

FYR Macedonia launches consultancy service tender for railway line project to the Bulgarian border

FYR Macedonia announced a tender for provision of  consultancy services for drafting Kriva Palanka – Deve Bair railway line project, part of Corridor VIII and the last section of the west-east corridor connecting Macedonia and Bulgaria. Interested companies are invited to submit bids until the 20th of November and the project needs to be finished in 22

0 comment Read Full Article

EBRD prior notice: rehabilitation project of a 30.8 km section of Corridor VIII in the east of FYR Macedonia

Public Enterprise for Railway Infrastructure intends using the proceeds of a loan from the European Bank for Reconstruction and Development for a project to the rehabilitation of a 30.8 km section of Corridor VIII in the east of FYR Macedonia. The proposed project, which has a total estimated cost of

0 comment Read Full Article
    Government of FYR Macedonia and China’s CSR signed contract for the delivery of 6 MUs

Government of FYR Macedonia and China’s CSR signed contract for the delivery of 6 MUs

The Government of FYR Macedonia and China South Locomotive & Rolling Stock Corporation (CSR) signed a contract for the delivery of 6 new MUs (4 DMU and 2 EMU). It is CSR’s first sale in Europe and Macedonia’s the first investment in rolling stock in 35 years. The first train should reach Macedonian Railways

0 comment Read Full Article